Documents
US 550 Phase B Report Final
(This is a large file)
Last updated 8-3-2016
US 550 Phase B Report Final Appendices
(This is a large file)
Last updated 8-3-2016
December 2015 Documents
Click each button below to download the individual documents.
NM 528 Continuous Flow Intersection
NM 528 Flyover Intersection
NM 528 Super Street Intersection
Reversible Plan
Six Lane Median Plan
Super Street Plan
Traffic Operations and Safety Report
Click each button below to download the separate chapters of the report.
Table of Contents
Ch.1-2 Intro and Existing Conditions
Ch.3 Preliminary Traffic Analysis
Ch.4 Signal Timing Improvements
Ch.5 Long Term Capacity Design Alternatives
Ch.6 Access Management Analysis
Ch.7 Crash Analysis
Ch.9 Transit Facilities
Ch.8 Pedestrian Facilities
Ch.10 ITS Improvements
Ch.11 Summary
Corridor Study Report
Click each button below to download the separate chapters of the report.